Large-scale modernization on the Small Ring Road (KXAY)
As previously reported, major repair works are underway on the 2 km section of the Small Ring Road (KXAY) passing through Chilanzar district — from the Eye Microsurgery Hospital to Farhod Street.
Summary of works completed to date:
🛣 Road pavement and asphalt laying ⏺ The old pavement was removed by milling on an area of 61,551 m², and new asphalt is currently being laid on this section. ⏺ 6,515 linear meters of new curbs were installed.
💧 Drainage system The drainage network has been renewed to prevent water accumulation on the roads: ⏺ 5,763 linear meters of LI-5 type gutters were installed. ⏺ 600 linear meters of metal drainage pipes with a diameter of 325 mm were laid.
⚙️ Engineering communications Vital underground utility networks have been fully modernized: ⏺ Cold water network: 560 meters of new pipes (D-600 and D-300). ⏺ Hot water network: 120 meters of main pipes (D-800).
🚀 YHTEM — at the service of the capital’s road safety and comfort!

⏺ Take a look at the results of large-scale works carried out over the past 24 hours:🚦 Smart Traffic Lights: On Farg‘o...

🗑 March 30 was designated by the United Nations as the International Day of Zero Waste. This day is aimed at reducing w...

For this purpose, 204.7 billion soums have been allocated.Of which: — 112 projects — construction works — 54 projects ...

🚦 Smart Traffic Lights:On Bobur Street, anchor blocks for traffic light support poles were installed at 4 sites — a tot...