Old version
Font size:
Color scheme:
Images:

9 March 2026. Road Traffic Organization Center

⭕️ On 9 March, in the capital, works aimed at improving the technical condition of the street and road network, increasing traffic safety and capacity continued on a planned basis.

🛣 Current repair works 🔹 Milling works – 4,413 m² 📍 In Yangihayot district: Marg‘ib – 500 m², Chortoq – 200 m²; 📍 In Yashnobod district: Jarqo‘rg‘on – 2,700 m², Mo‘ynoq – 450 m²; 📍 By the Central Streets Department: Buyuk Ipak Yuli – 100 m², Osiyo – 400 m², KHAY – 8 m², Gavhar – 23 m², Katta Hirmontepa – 15 m², Zargarlik – 17 m². 🔹 Asphalt laying works – 1,216 m² 📍 In Sergeli district: Yangihayot – 250 m², Zamaxshariy – 350 m²; 📍 By the Central Streets Department: Buyuk Ipak Yuli – 126 m², Osiyo – 420 m², KHAY – 9 m², Gavhar – 25 m², Katta Hirmontepa – 17 m², Zargarlik – 19 m² ⬆️ Road lines and signs (at night, from 00:00 to 06:00) 🟡 Horizontal road markings applied – 3,500 meters (Muqimiy – 500 meters, on Farg‘ona Yuli street – 3,000 meters) 🔄 Road signs 32 replaced, 14 new installed: 📍 On Bunyodkor street – 7 replaced, 2 new installed; 📍 On Osiyo street – 6 replaced, 6 new installed; 📍 On KHAY – 19 replaced, 6 new installed. 🚦 Smart traffic lights 🔹 On Buyuk Ipak Yuli, Sh. Burkhonov and Botir Zokirov streets, 8 underground poles were installed, cables laid and installation works completed; 🔹 At Qatortol – Taxtapul intersection, concrete pouring works were performed; 🔹 At Qatortol 1-tor – Qatortol intersection, earth excavation, pipe laying and anchor block installation works were carried out; 🔹 At THAY – Dehqonobod and Chilonzor – Cho‘ponota intersections, traffic lights were installed. 🏗 Bus stop renewal 🔹 On Botir Zokirov, Buyuk Ipak Yuli and Islom Karimov streets, 3 bus stops were installed; 🔹 On Buyuk Ipak Yuli – 2, Maxtumquli – 2, Osiyo – 1 and in KHAY areas – 1 – total 6 modern bus stops are being renewed (works ongoing). 🏗 Additional works 🔹 On Bunyodkor, KHAY and Osiyo streets, 61 poles intended for road signs were painted and repaired; 🔹 On Maxtumquli street – 4, on Sebzor street – 8 – total 12 lighting poles were painted.

Works aimed at ensuring traffic safety and convenient infrastructure on the capital’s roads continue consistently.

Tags:
Similar news
Modernization of Tashkent Road Infrastructure: Report as of March 30, 2026
31.03.2026, 11:52
Modernization of Tashkent Road Infrastructure: Rep...

⏺ Take a look at the results of large-scale works carried out over the past 24 hours:🚦 Smart Traffic Lights: On Farg‘o...

♻️ March 30 — International Day of Zero Waste
30.03.2026, 16:09
♻️ March 30 — International Day of Zero Waste

🗑 March 30 was designated by the United Nations as the International Day of Zero Waste. This day is aimed at reducing w...

28.03.2026, 11:19

Large-scale modernization on the Small Ring Road (KXAY)As previously reported, major repair works are underway on the 2 ...

In Tashkent, 166 projects will be implemented within the framework of the first season of “Open Budget” for 2026
27.03.2026, 09:38
In Tashkent, 166 projects will be implemented with...

For this purpose, 204.7 billion soums have been allocated.Of which: — 112 projects — construction works — 54 projects ...

We have launched a new version of the website. If you wish to return to the old version, please click here.

Old version